Launch offer — valid today only

Prepare for the Concrete Special Inspector Exams One Drawn Page at a Time With Every Inspection Topic Drawn Step by Step!

Continuous vs. periodic, lap splices, cover, beam and footing schedules: in IBC Chapter 17 and ACI 318 it's a wall of text. Here each topic fits on one page, with the drawing, what to check and where it lives in your references. 59 drawn pages.

I WANT TO STUDY IT WITH DRAWINGS

🔒 Secure checkout · PDF by email · 30-day guarantee

One topic per pagethe drawing shows you what to check and the text walks you through it
59 drawn pages8 parts, from the three exam modules to the final review map
Up-to-date sourcesICC content outline, IBC Chapter 17, ACI 318 and ASTM field tests

This Is What the Pages You Will Study Look Like

One topic per page, the drawing that shows you what to check, and the boxes with what you need to know:

GR + Codes + Plans, any order, three years to pass them all
GR + Codes + Plans, any order, three years to pass them all
Continuous vs. periodic, with the tasks the IBC Chapter 17 concrete table assigns to each
Continuous vs. periodic, with the tasks the IBC Chapter 17 concrete table assigns to each
Mix ID, f'c 4,000 psi (example value), w/cm, slump, air, aggregate size, admixtures: seven fields to verify.
Mix ID, f'c 4,000 psi (example value), w/cm, slump, air, aggregate size, admixtures: seven fields to verify.
Rebar marks read in order: mill, size, steel type, grade (60 or one line).
Rebar marks read in order: mill, size, steel type, grade (60 or one line).
Wall form check (example): 10 in on the drawing, 10 in on the tape, string line straight, braces tight.
Wall form check (example): 10 in on the drawing, 10 in on the tape, string line straight, braces tight.
7 numbered pre-pour checks: forms, rebar, embeds, water and debris, subgrade, test gear, documents.
7 numbered pre-pour checks: forms, rebar, embeds, water and debris, subgrade, test gear, documents.
One sheet, five blocks: f'c, rebar grade, cover, splices and special inspection notes
One sheet, five blocks: f'c, rebar grade, cover, splices and special inspection notes
Continuous vs. periodic, contact vs. noncontact, C231 vs. C173: seven mix-ups, one line each
Continuous vs. periodic, contact vs. noncontact, C231 vs. C173: seven mix-ups, one line each

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 55 topics.

It's Not You: Nobody Ever Put It in Order for You.

You've done slump and cylinders for years. Then you open the practice plans and find the beam schedule...

...and it's a grid of marks, bar counts and spacing you're supposed to read in order. You know the job. The problem is how it's written.

Mix ID, f'c 4,000 psi (example value), w/cm, slump, air, aggregate size, admixtures: seven fields to verify.

Here the beam and column schedules are drawn and labeled, column by column, next to the general notes you read first.

And on the pages next to it: foundation plans and footing schedules, slab plans and sections, details, callouts and bar lists.

First you understand why each field matters. Then the order comes back on its own.

SEE THE DIFFERENCE

Stop memorizing inspection rules you can't picture:

THIS
  • Pages and pages of dense code text
  • Inspection tasks without a single drawing
  • On exam day, you don't know where to start
Under the provisions governing special inspection, each verification task is assigned a classification of either continuous or periodic observation. Continuous observation requires the approved inspector to remain present for the full duration of the operation in question, whereas periodic observation permits intermittent presence at intervals sufficient to confirm compliance, together with observation upon completion. The applicable classification for each concrete-related task is to be determined by reference to the tabulated requirements, the statement of special inspections and the approved construction documents, as modified by the registered design professional.
FOR THIS
  • Every inspection task drawn
  • One topic per page, with the rules in boxes
  • A “where it lives” line on every page, so you find it fast in your references
Continuous vs. periodic, with the tasks the IBC Chapter 17 concrete table assigns to each
CONTENTS

Take a Look at the 8 Parts and 55 Topics

The exam modules, inspector duties, concrete quality, reinforcement, formwork and embeds, placement and curing, plan reading and review: 59 pages, all illustrated

IThe Concrete Special Inspector Exams · pp. 5-9
  1. Three Modules: General, Codes, Plans
  2. Where Special Inspection Comes From
  3. The Reference Books and How to Tab Them
  4. The Plans Module: Working from Drawings
  5. How to Use This Book
IISpecial Inspector Duties · pp. 10-15
  1. Continuous and Periodic Special Inspection
  2. The Statement of Special Inspections
  3. Duties and Responsibilities on Site
  4. Notifying Discrepancies
  5. Daily Inspection Reports
  6. The Final Report
IIIConcrete Quality · pp. 16-24
  1. Reading the Approved Mix Design
  2. Batch Tickets: What to Check at the Truck
  3. Sampling Fresh Concrete
  4. The Slump Test
  5. Air Content
  6. Concrete Temperature and Unit Weight
  7. Making Test Cylinders
  8. Curing, Handling and Transporting Specimens
  9. Strength Test Reports: Reading the Results
IVReinforcement · pp. 25-37
  1. Reading Bar Marks: Size, Grade, Mill
  2. Bar Sizes and Diameters
  3. Rust, Mill Scale and Oil
  4. Placement Tolerances
  5. Concrete Cover: Why and Where
  6. Chairs, Bolsters and Supports
  7. Spacing Between Bars
  8. Standard Hooks and Bends
  9. Stirrups and Ties
  10. Development Length: the Idea
  11. Lap Splices: Contact and Noncontact
  12. Mechanical Splices and Welding of Bars
  13. Coated Bars: Epoxy and Galvanized
VFormwork, Joints and Embeds · pp. 38-43
  1. Formwork: Lines, Grades and Bracing
  2. Form Removal and Reshoring
  3. Construction Joints: Location and Preparation
  4. Contraction and Isolation Joints
  5. Anchor Bolts and Embedded Plates
  6. Sleeves, Conduits and Pipes in Concrete
VIPlacement, Consolidation, Protection and Curing · pp. 44-51
  1. The Pre-Placement Checklist
  2. Conveying and Depositing: Avoiding Segregation
  3. Placing in Walls and Columns
  4. Consolidation with Vibrators
  5. Hot Weather Concreting
  6. Cold Weather Concreting
  7. Curing Methods
  8. Defects: Honeycombing and Cold Joints
VIIPlan Reading · pp. 52-56
  1. Structural General Notes
  2. Foundation Plans and Footing Schedules
  3. Beam and Column Schedules
  4. Slab Plans and Sections
  5. Details, Callouts and Bar Lists
VIIIReview · pp. 57-59
  1. Frequent Mix-Ups, Side by Side
  2. The Exam-Day Lookup Routine
  3. Final Review Map

What If Every Topic Fit on a Single Page?

Picture this:

Instead of rereading half a page on lap splices without being able to picture them...

...you open the page and find the contact splice and the noncontact splice drawn side by side, with what the inspector checks on each.

Wall form check (example): 10 in on the drawing, 10 in on the tape, string line straight, braces tight.

And bar marks, cover, chairs, the slump test and the beam schedule turn into drawings and tables you read at a glance.

You stop repeating and start understanding.

That's Concrete Special Inspector, Illustrated: 8 parts, 55 illustrated topics, and at the end the frequent mix-ups side by side, an exam-day lookup routine and a final review map. What you see in order, you remember.

Because what your brain sees organized, it remembers.

Here Is What You Get with Concrete Special Inspector, Illustrated:

Ipp. 5-9

The Concrete Special Inspector Exams

The three modules (general, codes, plans), where special inspection comes from, the reference books and how to tab them, working from drawings and how to use this book.

IIpp. 10-15

Special Inspector Duties

Continuous and periodic inspection, the statement of special inspections, duties on site, notifying discrepancies, daily reports and the final report.

IIIpp. 16-24

Concrete Quality

Check a truck without hesitating: the approved mix design with its fields circled, batch tickets at the truck, sampling, slump, air, temperature and unit weight, cylinders, specimen handling and strength reports.

IVpp. 25-37

Reinforcement

Read a rebar mat in the same order every time: bar marks and sizes, rust and mill scale, tolerances, cover, chairs, spacing, hooks, stirrups and ties, development length, lap and mechanical splices, and coated bars.

Vpp. 38-43

Formwork, Joints and Embeds

Formwork lines, grades and bracing, form removal and reshoring, construction, contraction and isolation joints, anchor bolts, embeds, sleeves and conduits.

VIpp. 44-51

Placement, Consolidation, Protection and Curing

The pre-placement checklist, conveying without segregation, walls and columns, vibrators, hot and cold weather, curing methods, honeycombing and cold joints.

VIIpp. 52-56

Plan Reading

Structural general notes, foundation plans and footing schedules, beam and column schedules, slab plans and sections, details, callouts and bar lists.

VIIIpp. 57-59

Review

The frequent mix-ups side by side, the exam-day lookup routine and a final review map.

At the end of the book: The frequent mix-ups side by side, an exam-day lookup routine and a final review map.

And That Is Not All: 2 More Books, Free

Pour Day Walkthroughs: 30 Site Scenarios, Step by Step

BONUS 1: «Pour Day Walkthroughs: 30 Site Scenarios, Step by Step»

Value on its own: US$ 17.90

Practice thinking like the special inspector on site: 30 original scenarios, from rebar inspection to the pour and the cylinders, each with what to check, the frequent discrepancy and the reference to look in.

250 Concrete Inspection Terms on Cards

BONUS 2: «250 Concrete Inspection Terms on Cards»

Value on its own: US$ 14.90

Review the vocabulary fast: 250 real terms, each on a numbered card with a one-line definition, 10 cards per page, across special inspection, mix design, fresh concrete tests, cylinders, reinforcement, splices, formwork, joints, embeds, placement, curing and plan reading.

Concrete Special Inspector, Illustrated + 2 Free Books

  • Concrete Special Inspector, Illustrated: 59 drawn pagesUS$ 63
  • BONUS 1: Pour Day Walkthroughs: 30 Site Scenarios, Step by StepUS$ 17.90
  • BONUS 2: 250 Concrete Inspection Terms on CardsUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT CONCRETE SPECIAL INSPECTOR, ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: Concrete Special Inspector, Illustrated reaches your inbox as a PDF, and the two free books come by email too. One-time payment, no installments or hidden costs.

Is This Book for You?

You're studying for the certification

You're studying for the certification

Duties, concrete quality, rebar, formwork and placement, one topic per page, to study at night with your references open.

Your exam or retake is close

Your exam or retake is close

The frequent mix-ups side by side, the exam-day lookup routine and a final review map, plus a “where it lives” line on every page.

You already work around concrete

You already work around concrete

A quick visual refresher of pour day: mix design, pre-pour checks, slump, cylinders and plan notes, printable for the jobsite.

To Sum Up: Here Is What You Get

US$ 95.80US$ 27
YES, I WANT CONCRETE SPECIAL INSPECTOR, ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

30-day guarantee: tell us what didn't work and we'll refund 100%.

You have 30 days to try Concrete Special Inspector, Illustrated and the two bonus books. If a file won't open, if the content isn't what this page describes, or if something doesn't arrive, write to us: tell us what didn't work and we'll refund 100% of what you paid. One-time payment, no subscriptions, no surprises.

Frequently Asked Questions

How do I get the material?

You get Concrete Special Inspector, Illustrated as a high-resolution PDF by email, to read on your phone or print. The two bonus books, Pour Day Walkthroughs and 250 Concrete Inspection Terms on Cards, also come by email.

Is it a monthly or a one-time payment?

A one-time payment of US$ 27. No installments, no subscription.

Who is it for?

For field technicians, lab personnel, building inspectors and contractor QC preparing the Reinforced Concrete Special Inspector modules, or getting ready for a retake. It's written for people who already work around concrete. Check the table of contents above to see the topics.

What sources is it based on?

On the ICC Special Inspector exam pages and the content outline for the Reinforced Concrete Special Inspector, checked against the special inspection chapter of the IBC (Chapter 17), ACI 318 and the ASTM field test methods for concrete (C31, C94, C143, C172). No code text or tables are reproduced: each page points you to where the topic lives in your references. Numbers used as examples (like a 10-inch wall) are labeled as examples, and any value taken from the code is marked so you confirm it in your edition.

Is this official material?

No. It's an independent study guide, not published, reviewed or endorsed by the ICC, ACI or ASTM. It doesn't give you a certificate, CEUs or exam credit: the certification only comes from passing the ICC exams.

Does it replace my references or a prep course?

No. You still need the references listed in the current ICC exam bulletin for your exam, in the editions it lists. This book isn't tied to one code edition: each page explains the topic and tells you where it lives in your references, so you confirm the exact wording and values in the edition your exam uses. It doesn't replace your references, your training or the project specifications.

Are the practice scenarios the real exam questions?

No. The site scenarios and the exam trap boxes are written for this book. They're not official questions from any exam: they're there to train you.

Can I print it?

Yes. It's a PDF you can print in full or by page and take to the jobsite or your study desk.

What if I don't like it?

You have 30 days. Tell us what didn't work and we'll refund 100% of what you paid.

One Last Thing Before You Decide...

You don't have to reread the same page hoping it sticks this time.

You don't have to memorize inspection rules you can't picture.

And you definitely don't have to walk into the exam without knowing where to start.

One last thing before you decide: you already know concrete. What's missing is the order. Here every topic is one page, with the drawing and a line that tells you where it lives in your references.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT CONCRETE SPECIAL INSPECTOR, ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.